ODP Leg 200: Drilling at the Hawaii-2 Observatory (H2O) and Nuuanu Landslide Academic Article uri icon

abstract

  • Leg 200 investigations targeted two distinct projects in the Pacific Ocean east of Hawaii. The drilling and preparation of long-term measurement boreholes at the Hawaii-2 Observatory (Site 1224) was the primary objective. A test borehole into the distal portions of the Nuuanu landslide (Site 1223) was the secondary objective.

publication date

  • 2002